The guide to turn pressure and waypoints planned the gas for a dive. The last step is to carry out the plan in the water: leave the bottom on time, go up at the planned speeds, and hold each stop for its full time.
A decompression stop is a depth you hold for a set time on the way up. While you wait there, your tissues release gas without going past the limit the model allows. When the stop time is over, the model allows you to move up to the next stop.
The model works out a decompression ceiling: the shallowest depth it allows you to go to at that moment. The ceiling moves up as you release gas, which is called off-gassing. Think of it like opening a fizzy drink: release the pressure slowly and the gas leaves quietly.
Stops are set every 3 m (3, 6, 9, 12 m and so on). Each stop is the first of these depths at or deeper than the ceiling. On the example dive the ceiling at the end of the bottom time is 21.7 m, so the first stop is at 24 m.
The example follows one plan from the surface back to the surface: 45 m for 25 minutes. The bottom gas, the gas you breathe at depth, is trimix 21/35: 21% oxygen, 35% helium and the rest nitrogen. From 21 m you breathe EAN50, nitrox with 50% oxygen, as a deco gas to speed up decompression. The change of gas is called a gas switch. The gradient factors are 30/70, which keep the tissues further from their limits than the bare model does (see gradient factors). The dive was planned with DiveLogic.
Reading the schedule
A schedule lists the bottom, each stop and the gas switch in the order you reach them. Each row gives 4 things: the depth, the time at that depth, the runtime at which you leave it, and the gas you breathe there.
Runtime is counted from the moment you leave the surface. Time is the length of that one row. Mixing up the 2 is a common mistake when copying a plan onto a slate, so check which column you are reading.
Runtime is what tells you whether you are on schedule. At each row, being early and being late do not cost the same. Leaving the bottom late means more gas taken up than the plan allows for; leaving early means less. Leaving a stop early cuts decompression the plan needs.
A delay does not go away. If one stop runs 2 minutes late, every later runtime moves 2 minutes too. The stop times stay as planned: you do not shorten the next stop to catch up with the clock.
| Depth | Time (min) | Runtime | Gas |
|---|---|---|---|
| 45 m | 25 | 27:15 | 21/35 |
| 24 m | 1 | 30:35 | 21/35 |
| 21 m | switch | 31:35 | EAN50 |
| 18 m | 1 | 33:35 | EAN50 |
| 12 m | 2 | 37:35 | EAN50 |
| 9 m | 4 | 42:35 | EAN50 |
| 6 m | 8 | 51:35 | EAN50 |
| 3 m | 14 | 66:35 | EAN50 |
| Surface | 69:35 |
Planned with DiveLogicPlan this dive
- 21/35
- EAN50
- Ceiling
Planned with DiveLogicPlan this trimix dive
The descent
The runtime clock starts when you leave the surface. The descent to 45 m at 20 m/min takes 45 ÷ 20 = 2.25 minutes, or 2 minutes 15 seconds.
The descent is part of the plan. Your tissues take up gas on the way down, and the plan counts that time.
Leaving the bottom on time
The plan allows 25 minutes at 45 m, so you leave the bottom at a runtime of 27:15. Every stop in the schedule depends on this time.
The ceiling, drawn in red, has moved down during the bottom time. When you leave, it is at 21.7 m.
Going up to the first stop
You go up to the first stop at an ascent rate of 9 m/min. The first stop is at 24 m and lasts 1 minute.
The ceiling is shallower than the stop, as it is at every stop. The stop depth is where you wait. The ceiling is the limit you must not go above.
The stops and the gas switch
Between stops you go up at 3 m/min, so each 3 m move takes 1 minute. Hold each stop for its full time before you move.
At 21 m you switch to EAN50. Check the cylinder and the depth with your buddy before you breathe from it. The diver’s cylinder changes colour at the switch. The stops get longer as you go up: 2 minutes at 12 m, 4 at 9 m, 8 at 6 m.
The last stop and the surface
The last stop, 14 minutes at 3 m, is the longest. From the last stop to the surface you go up at 1 m/min, so the last 3 m take 3 minutes.
The model counts this slow final ascent as decompression. You surface at a runtime of 69:35.
Leaving the bottom late
A schedule is right only for the dive it was planned for. If you stay on the bottom longer, your tissues take up more gas, and the plan you carry no longer fits.
Move the slider to plan the same dive again with extra minutes at 45 m. With 5 extra minutes the new plan adds stops at 21 m and 15 m, drops the 18 m stop, and makes the 9 m stop 5 minutes instead of 4, the 6 m stop 10 minutes instead of 8 and the 3 m stop 17 minutes instead of 14. The time to surface (TTS) rises from 42 to 50 minutes and the runtime from 69:35 to 82:35. The dive uses about 415 L more 21/35 and 170 L more EAN50.
- Original plan
- 21/35
- EAN50
| Stop | Original | +5 min |
|---|---|---|
| 24 m | 1 min | 1 min |
| 21 m | none | 1 min |
| 18 m | 1 min | none |
| 15 m | none | 2 min |
| 12 m | 2 min | 2 min |
| 9 m | 4 min | 5 min |
| 6 m | 8 min | 10 min |
| 3 m | 14 min | 17 min |
| Leave the bottom | 27:15 | 32:15 |
| Time to surface | 42 min | 50 min |
| Runtime | 69:35 | 82:35 |
| 21/35 used | 2,424 L | 2,839 L |
| EAN50 used | 757 L | 930 L |
Planned with DiveLogicPlan an overrun for this dive
- Planned path
- Ceiling
- Stop band
Planned with DiveLogicPlan this dive
Where to hold a stop
Hold each stop at its depth or slightly below it, never above it. The blue band shows the 6 m stop and the metre below it.
At the start of the 6 m stop the ceiling is 4.9 m. The leading compartment is the tissue closest to its limit. At 6 m it is at a gradient factor of 46%.
Above the ceiling
Drift up 2 m at the start of the stop and you are at 4 m, above the 4.9 m ceiling. Above the ceiling, the leading compartment goes past the limit set by the gradient factor.
The plan does not visit 4 m at this time, so no gradient factor is given for that depth. The ceiling shows that the depth is not allowed.
Above the stop, below the ceiling
Later in the stop the ceiling has risen to 3.5 m. The same drift to 4 m is now below the ceiling, but it is still above the stop.
This is within the model’s limit, but it uses up the margin the plan keeps, and the rest of the schedule was worked out for a diver at 6 m. Go back down to the stop depth.
Finishing the stop
Held at 6 m, the leading compartment’s gradient factor falls from 46% to 19% by the end of the stop as the tissues release gas. The ceiling rises from 4.9 m to 3.0 m.
When the stop time is over, go up at 3 m/min to the next stop.
If you miss a stop
If you go above a stop or leave it early, follow the procedure for missed decompression that you were taught in training. Procedures differ between training systems. In general they take you back to the stop depth quickly, if you can do that safely, and add time to the stops that are left.
After a missed stop, stop diving for the day, watch for signs of decompression sickness, and get medical advice at the first symptom.
The end of this guide
This is the last guide in the series. You have followed a dive from the gas laws, through the body and the decompression models, to the equipment, the plan and the dive itself. The planner does the arithmetic, but the choices are yours: a sensible plan, a reserve you do not touch, and a schedule you follow. Get trained for each step before you take it.
What to remember
- A stop is a depth held for a set time so that tissues release gas without going past their limit. Stops are every 3 m, at or below the ceiling.
- Read the schedule by depth, time, runtime and gas. Runtime is counted from leaving the surface.
- Leave the bottom at the planned runtime. A longer bottom time needs longer stops and more gas, so carry a contingency plan for it.
- Go up at the planned speeds: here 9 m/min to the first stop, 3 m/min between stops, and 1 m/min from the last stop to the surface.
- Hold each stop at its depth or slightly below it. Above the ceiling the leading compartment goes past its limit.
Following a plan in DiveLogic
Plan the same dive, 45 m for 25 minutes on trimix 21/35 with EAN50 from 21 m at GF 30/70, and open the schedule in the Review step. The Contingency card adds overrun plans such as +5 min / +3 m, each with its own schedule to carry with the main plan.
Sources
- Bühlmann A. A. (1984). Decompression-Decompression Sickness. Springer, Berlin.
- Baker E. C. (1998). Understanding M-values. Immersed 3(3).
- U.S. Navy (2016). U.S. Navy Diving Manual, Revision 7. Naval Sea Systems Command, SS521-AG-PRO-010.